You have 0 items in your cart
FAR/AIM
>
Federal Aviation Regulations
>
PART 121—OPERATING REQUIREMENTS: DOMESTIC, FLAG, AND SUPPLEMENTAL OPERATIONS
>
Subpart U—Dispatching and Flight Release Rules
Subpart U—Dispatching and Flight Release Rules
Gleim provides the contents of its FAR/AIM here on our website for the benefit of those customers who need a concise, easy-to-use, quick reference of those regulations. For an on-the-go copy, the regulations are provided in a printed version, Gleim FAR/AIM.
Table of Contents
- § 121.591 Applicability.
- § 121.593 Dispatching authority: Domestic operations.
- § 121.595 Dispatching authority: Flag operations.
- § 121.597 Flight release authority: Supplemental operations.
- § 121.599 Familiarity with weather conditions.
- § 121.601 Aircraft dispatcher information to pilot in command: Domestic and flag operations.
- § 121.603 Facilities and services: Supplemental operations.
- § 121.605 Airplane equipment.
- § 121.607 Communication and navigation facilities: Domestic and flag operations.
- § 121.609 Communication and navigation facilities: Supplemental operations.
- § 121.611 Dispatch or flight release under VFR.
- § 121.613 Dispatch or flight release under IFR or over the top.
- § 121.615 Dispatch or flight release over water: Flag and supplemental operations.
- § 121.617 Alternate airport for departure.
- § 121.619 Alternate airport for destination: IFR or over-the-top: Domestic operations.
- § 121.621 Alternate airport for destination: Flag operations.
- § 121.623 Alternate airport for destination: IFR or over-the-top: Supplemental operations.
- § 121.624 ETOPS Alternate Airports.
- § 121.625 Alternate Airport weather minima.
- § 121.627 Continuing flight in unsafe conditions.
- § 121.628 Inoperable instruments and equipment.
- § 121.629 Operation in icing conditions.
- § 121.631 Original dispatch or flight release, redispatch or amendment of dispatch or flight release.
- § 121.633 Considering time-limited systems in planning ETOPS alternates.
- § 121.635 Dispatch to and from refueling or provisional airports: Domestic and flag operations.
- § 121.637 Takeoffs from unlisted and alternate airports: Domestic and flag operations.
- § 121.639 Fuel supply: All domestic operations.
- § 121.641 Fuel supply: Nonturbine and turbo-propeller-powered airplanes: Flag operations.
- § 121.643 Fuel supply: Nonturbine and turbo-propeller-powered airplanes: Supplemental operations.
- § 121.645 Fuel supply: Turbine-engine powered airplanes, other than turbo propeller: Flag and supplemental operations.
- § 121.646 En-route fuel supply: flag and supplemental operations.
- § 121.647 Factors for computing fuel required.
- § 121.649 Takeoff and landing weather minimums: VFR: Domestic operations.
- § 121.651 Takeoff and landing weather minimums: IFR: All certificate holders.
- § 121.652 Landing weather minimums: IFR: All certificate holders.
- § 121.653 [Reserved]
- § 121.655 Applicability of reported weather minimums.
- § 121.657 Flight altitude rules.
- § 121.659 Initial approach altitude: Domestic and supplemental operations.
- § 121.661 Initial approach altitude: Flag operations.
- § 121.663 Responsibility for dispatch release: Domestic and flag operations.
- § 121.665 Load manifest.
- § 121.667 Flight plan: VFR and IFR: Supplemental operations.